Case Studies

Here at Moffat we believe in more than just supplying goods, we believe in making a difference and helping connect you to the best solution that we can offer.

View our range of case studies from different businesses of all types of industry sectors, sharing their insights and outcomes from applications within their own businesses.

 

  • mcdonalds mccafe

    Moffat partners with McDonald's

    Location: APAC Region
    Date established: 1993

    Following its successful application here in Australia, the E25 Turbofan oven was then implemented in McCafés throughout New Zealand, Hong Kong and, most recently, Japan.

    see details
  • Jumeirah Hotel in Etohad Towers, Abu Dhabi

    Jumeirah Hotel, Abu Dhabi

    Location: Abu Dhabi, Dubai
    Date established: 2006

    There are a total of sixteen kitchens in the Jumeirah Hotel outfitted with the best in durable, hard-working Waldorf technology – the scale and scope of the complex demanding both quantity and quality.

    see details
  • Palmer Station in Antarctica

    Palmer Station, Antarctica

    Location: Anvers Island, Antarctica
    Date established: 1968

    The station has recently installed a Turbofan Double Stack E32D5 and love the results the units are delivering. Thanks to the built-tough durability and versatility of Turbofan technology, the station’s occupants are looking forward to a long relationship with the ovens.

    see details
  • Royal Australian Air Force

    Royal Australian Air Force (RAAF)

    Location: Victoria, Australia
    Date established: 2008

    Within the kitchen, an average of 1,000 meals per day are served during breakfast, lunch & dinner for the flight officer’s training school and the RAAF Roulettes aerobatic team.

    see details